The first article in this series summarised the shortcomings that reduce the reliability of decarbonisation audits. Audits should provide a clear and practical capital expenditure (cap-ex) plan to aid in the transition to a net zero economy.

The second article examined the Energy Performance of Buildings Directive (EPBD) and its potential to make net zero reporting a more reliable piece of information on which real estate professionals can base their investment decisions.

Most investors already have a plan in place to decarbonise their portfolios by 2050, in line with the Paris Agreement and EU legislation. Accordingly, most assets in their portfolios are being assessed in the context of a Carbon Risk Real Estate Monitor (CRREM) pathway.

Decarbonisation audits play a key role in supporting investors with a cap-ex plan to become Paris Agreement aligned. However, the European real estate market is also being influenced by the following factors.

  • Asset management strategies often depend on rental agreements; the duration and renewal of these agreements set the best opportunity to improve or retrofit buildings.
  • When planning capital outlays, investors should consider the multiple dimensions of a building's obsolescence, age and design in addition to regulatory considerations and building location; this will maximise their return on investment. They should also assess the best moment for a total or partial refurbishment, especially for older buildings.
  • Lower energy costs and reduced emissions from a refurbished building help attract tenants while improving the building's reputation and market appeal.

The decarbonisation audit process was explored in the first article in this series and European decarbonisation targets under the EPBD in the second.

By contrast, this article focuses on the practical application of these audits by looking at eight case studies across Europe, showcasing how projects can support decarbonisation, improve an asset's performance and enhance its value.

Case studies examine path to Paris Agreement

To understand where the European market stands in relation to Paris Agreement alignment, the RICS European Sustainability Working Group has brought together eight case studies from employers and clients.

The case studies provide examples of building refurbishments, details of the refurbishment process and the major interventions that were taken.

They also show how much capital is being invested in renovation work and which part of these investments are dedicated to sustainability improvements.

In total, eight case studies were collected from Italy, Poland and France, of which six were non-residential assets and two were residential homes (Table 1).

Table 1. Case study criteria. Source: Krysta Petropoulou MRICS, Federica Saccani MRICS and John Newton MRICS

Related article

Implications of the Energy Performance of Buildings Directive

Read more

Commercial property case studies

Built in 1970 and refurbished in 2023, Bernina in Milan, Italy embodies its owners' strong commitment to sustainability and energy efficiency.

Sustainable upgrades have transformed the building's energy efficiency; it now has an EPC rating of A, it consumes less water, and has outdoor spaces and green areas.

The sustainability initiatives have resulted in the building receiving:

Following refurbishment, the building was aligned with the EU Nearly-zero energy buildings (NZEB) standard and the new EPBD. 

Significant progress was made regarding carbon emissions when this office building was refurbished in 2025.

Following the renovations, operational emissions decreased to 27.9kgCO₂/m² per year, thus surpassing Invesco's 2030 goal of a 50% reduction compared to the baseline.

As for embodied carbon, a whole life carbon assessment (A1–C4) of the building calculated total emissions of 372kgCO₂/m², with upfront emissions (A1–A5) accounting for 253kgCO₂/m².

This figure represents a carbon intensity that is 64% lower than a typical new construction, and whole life cycle carbon emissions that are approximately 56% lower than those measured in a standard new build.

In 2023, the V Tower in Warsaw, Poland changed its owner, who began redevelopment work that concluded in 2025. The redevelopment project included several changes to bring the building up to modern standards for efficient and versatile rental spaces.

However, the focus of the redevelopment was not only on the comfort of future tenants, but also sustainability. The refurbishment:

  • improved the building's energy efficiency
  • maximised the reduction of the building's operational carbon footprint and primary energy
  • helped the building meet the requirements of the EU taxonomy for sustainable activities, Part 7.2, Climate Change Mitigation, Construction and Real Estate Activities
  • received a BREEAM Gold certification
  • minimised the building's embodied carbon footprint.

More specifically, the refurbishment reduced the building's embodied carbon footprint by more than 85% compared to that of a newly constructed building, and the primary energy EPC score was reduced by up to 31% compared to the pre-retrofit building.

The Diuna office complex in Warsaw, Poland, formerly known as Marynarska Business Park, embodies the vision of designing office spaces that better fit the needs of users, cities and local communities.

Following refurbishment work in 2022, the complex's concrete parking lot was turned into an urban park with native plants, which improved air quality, increased biodiversity and reduced its urban heat island score.

More modern, green solutions to reduce the building's energy consumption and operational carbon footprint were also introduced.

The building complex went through many processes to achieve multi-criteria certification, including a WELL Health-Safety Rating, a BREEAM In-Use 'Excellent' rating and a WiredScore certification.

A number of activities and solutions were carried out to decarbonise the Diuna complex.

  • An energy audit made it possible to identify parts of the building that needed maintenance or that were energy inefficient.
  • A decarbonisation audit made a recommendation that a technical audit be performed for ongoing work.
  • A digital twinning modelling process facilitated the construction of a digital twin, which can be updated on an ongoing basis and assist in decision making related to the implementation of further decarbonisation solutions.

The Odissy building in Issy-les-Moulineaux, France – a 6,500m² commercial building constructed in 2000 – underwent a turnkey renovation in 2023.

The refurbishment aimed to respond to new uses and user expectations while also adopting an ambitious environmental approach to create sustainable value in compliance with French and EU sustainability requirements.

The key issues taken into account during the refurbishment process were energy, carbon, end users, mobility, biodiversity and operational management.

To transform the building into a connected and sustainable complex that integrates energy performance, health and well-being, biodiversity and sustainable mobility, a range of innovative measures were implemented through a people-centred approach focused on long-term environmental and social value.

Following the renovation work, the building received:

In contrast to the previous case studies, the refurbishment of the Levallois Perret building in Paris, France is ongoing and expected to complete by the end of 2026.

This project is a major refurbishment that will extend and preserve the original building structure, replacing its technical equipment and undertaking interior fit-out.

The aim is to give this real estate complex a new identity and achieve high-performance objectives for office spaces through densification and optimisation of the gross leasable area.

The project entails modernising and repositioning an existing office complex by retaining the building structure, upgrading all major systems, improving sustainability and user experience, and maximising the amount and quality of rentable office space.

To improve the real estate asset's quality and highlight the advantages of its architectural and technical design, the client wishes to implement an environmental certification approach. The building has already achieved a BREEAM International Refurbishment and a Fit Out 'Excellent' level.

Achieving BREEAM International Refurbishment and Fit Out 'Excellent' certification demonstrates high sustainability performance through reduced resource consumption, improved occupant well-being, stronger environmental management, enhanced asset resilience, and recognition of sustainability best practice.

Residential case studies

The commercial case studies above focused on different examples of office buildings across Europe. The following examples from the residential sector were created in collaboration with Edera, a market-oriented initiative headed by Edera Srl Impresa Sociale in Italy.

The initiative promotes the retrofit of buildings through innovative, industrialised solutions and a digital process capable of making interventions more effective, faster, cheaper and inclusive.

Corte franca in Brescia was Edera's first project in Italy involving a multifamily house and an integrated industrialised retrofit.

This industrialised renovation construction approach combined deep energy retrofits – a comprehensive renovation approach that delivers significant reductions in a building's energy consumption and carbon emissions while achieving a high level of energy performance – with off-site construction methods to upgrade the building to a fully electric NZEB level and improve its seismic vulnerability index from 0.09 to 0.6.

The off-site construction methods involved using prefabricated components to retrofit buildings, reducing on-site construction time, lowering costs and improving safety for workers.

Eighteen prefabricated facade panels were installed in less than a week. Compared with a conventional renovation using traditional construction methods, the project achieved a 55% reduction in combined operational and embodied carbon emissions (measured as tCO₂eq/m²).

In addition, operational carbon emissions were reduced by 75% compared with the building's pre-renovation performance.

The intervention was completed with a government-sponsored retrofit incentive.

Russoli was the first Edera project applied to public housing in Italy. The residential complex in a southern suburb of Milan is composed of four towers and 187 public apartments owned by ALER (Lombardy's public housing authority). 

As well as upgrading its aesthetic and economic value, the buildings' environmental and social refurbishment resulted in its EPC rating changing from B (due to a previous retrofit) to A2.

The retrofit installed new windows, shutters, green roof insulation and 5,935m² of off-site timber frame facades insulated with bio-based materials.

On the systems side, the complex's thermal power station was renovated using district heating with thermal regulation and metering systems. A photovoltaic system with storage for electric consumption was also installed.

The renovation work's key achievements include:

  • the use of innovative off-site bio-based facades created via a circular economic approach to rice and agricultural waste
  • a safer and less disruptive construction site
  • greater use of renewables
  • lower energy bills
  • reduced energy poverty.

Key takeaways from the case studies

The case studies above represent a step forward in aligning investors' portfolios with the Paris Agreement. A few takeaways from them that we have identified are as follows.

  • When looking at the year of construction, a building's obsolescence remains one of the key drivers of refurbishment. Most of Europe's buildings are more than 20 years old, and the refurbishment of an asset can create opportunities not only to align with the Paris Agreement, but also to attract better tenants and increase the asset's value.
  • The outcomes varied depending on the scope of refurbishment work undertaken and the amount invested in this work reflected differences in building condition, retrofit and pre-existing energy performance.
  • With an investment of close to one-third of a new building's value in retrofitting, an owner can reduce total operational emissions by 50% to 60%. Therefore, by spending less than is needed for the construction of a new building, owners can obtain the same results through refurbishment, but with more benefits. Compared with demolition and reconstruction, refurbishment can deliver similar energy performance outcomes while preserving embodied carbon, reducing construction waste, lowering material consumption, shortening delivery times, and minimising disruption to occupants.
  • Certification plays a key role in the sector; most owners and investors look to have their assets certified post-refurbishment.
  • Progress towards implementing the requirements and objectives of the EPBD is encouraging but remains uneven across Europe. While leading projects such as Bernina 7 and Odissy have integrated whole life carbon assessment, renewable energy systems, and digital energy monitoring in line with EPBD principles, many renovation projects continue to face barriers including high upfront costs, fragmented supply chains, skills shortages, and limited access to financing, slowing the uptake of advanced renovation practices.
  • Industrialised renovation, also referred to as off-site renovation, involves the manufacture of building components in a factory before installation on site. As demonstrated by Edera projects, this approach can significantly reduce renovation times and carbon emissions.

In most markets, refurbishments remain driven by near-term asset management goals, such as reducing operational costs, extending lease terms or improving the asset's image, rather than by decarbonisation trajectories.

While investors are aware of their portfolios' CRREM pathways, the pace of capital deployment is modest, and embodied carbon is seldom measured systematically. The gap between awareness and execution therefore remains significant.

'In most markets, refurbishments remain driven by near-term asset management goals'

Conclusions and reflections

Retrofitting older buildings to meet sustainability objectives and comply with evolving regulations is a deeply complex task. It requires not only technical upgrades, but also a holistic understanding of building performance, commercial realities and regulatory frameworks.

However, too often, as demonstrated in the first article in this series, net zero audits fall short due to inaccurate assumptions, poor modelling and unrealistic cap-ex figures.

This is where there is a danger of consultants offering oversimplified solutions that ignore synergic effects, lack transparency and fail to meet professional standards.

In turn, this can misguide investment decisions and derail sustainability strategies, which leads to disappointing outcomes, undermines trust in the process and often leaves clients with costly retrofits that don't deliver the promised results.

But when done right, there is an opportunity. High-quality audits, grounded in dynamic modelling and robust standards, can unlock real value and turn complex retrofit challenges into strategic advantages.

They provide a reliable platform for cap-ex planning, support long-term asset resilience and align with EU directives, guidelines and standards.

Investors and market readiness mirror the maturity of the market. In mature markets, the green premium and brown discount identified in RICS' Sustainability Report 2024 and 2025 are beginning to influence capital values and rental levels, demonstrating that regulation and value are converging. 

However, elsewhere, high upfront costs, fragmented data and uncertainty about regulatory enforcement are slowing adoption.

The EPBD's new mechanisms, such as the requirement for national renovation plans, should gradually improve transparency and unlock financing.

As the industry moves from pilot projects to large-scale transformation initiatives, the harmonisation of net-zero audits is essential.

Without comparable data on operational and embodied carbon, market actors cannot evaluate refurbishment investments consistently or price climate risk effectively.

To accelerate progress, policymakers and industry must collaborate on mandatory life cycle carbon disclosure not only for new buildings, but also for major retrofits, interoperable digital data platforms and financial incentives rewarding deep, Paris Agreement-aligned retrofit.

Only through this integrated approach can the EPBD 2024 evolve from a regulatory framework into a tangible driver of market transformation toward a truly decarbonised European building stock by 2050.

Getting the right professional help is not optional; it's essential. With the right expertise, even the most challenging buildings can become an exemplar of sustainable transformation.

As the RICS European Sustainability Working Group is initiating a conversation to standardise net zero audits, the industry must also embrace quality, accountability and collaboration to ensure that decarbonisation audits become trusted tools for decision making and investment.

The authors would like to thank Edera and Steffen Walvius for their contributions to this article.

Krysta Petropoulou MRICS is commercial and asset management director at OTE Estate SA

Contact Krysta: Email

Federica Saccani MRICS is head of building consultancy Italy at JLL

Contact Federica: Email

John Newton MRICS is a project management and ESG consultant 

Contact John: Email | LinkedIn

Related competencies include: Data management, Sustainability

This article is a contribution from the RICS European Sustainability Working Group and is part of a series of three articles initiating discussions around standardising the net zero audit process for existing buildings. This is to enhance quality, consistency and transparency in achieving net zero goals in Europe.

Discover the new RICS Member App: CPD on the go

RICS has introduced a refreshed CPD approach that prioritises meaningful, high-quality learning that genuinely benefits your work and is tailored to your specialism, career stage, and the real-world challenges you face.​

The new app makes logging CPD simpler and more intuitive, so you can focus on the development that matters to your practice.